On March 22nd 2018, average power sent out was 95,581 MWh/day. The reported gas constraint was 2223 MW.
The reported line constraint was 153.7 MW.The reported frequency management constraint due to loss of DisCo feeders was 438.9 MW. The water management constraint was 0 MW. The power sector lost an estimated ₦1,278,000,000 due to constraints on this day.